An operator checking his phone at a CNC machine.

Three booths,
three conversations.

What exhibitors said, and what Instalead made of it.

What the rep said

Luis needs a CNC bracket in 6061 aluminium, about 5,000 a month, holding plus or minus five thou. He wants sample part drawings and our RFQ by next week, and first parts in 6 to 8 weeks.
LO
Luis OrtegaPlant Manager · Windsor Precision
Hot

AI notes

CNC bracket in 6061 aluminium, about 5,000 a month, ±0.005″. Wants sample drawings and the RFQ by next week; first parts in 6–8 weeks.

Next steps

  • Send the sample part drawings
  • RFQ to engineering · by next week
  • Follow-up email drafted

What the rep said

Priya’s line runs 120 packs a minute and changeovers are the problem. She’s planning a 2027 upgrade and wants us to look at the line layout before we quote.
PS
Priya ShahOperations · Lakeside Foods
Hot

AI notes

Line runs 120 packs a minute; changeovers are the pain. Planning a 2027 upgrade. Wants a layout review before a quote.

Next steps

  • Request the line layout
  • Book a line review
  • Follow-up email drafted

What the rep said

Mike needs ten welding systems for a robotic cell, 480 volt, working with the robots they already have. Wants budgetary pricing before month end.
MD
Mike DunnEngineering · Corvus Robotics

AI notes

Ten welding systems for a robotic cell, 480 V, to work with their current robots. Budgetary pricing before month end.

Next steps

  • Budgetary quote for 10 systems · Oct 31
  • Check robot integration with a specialist
  • Follow-up email drafted

Pilot Instalead at
your next manufacturing show.

Contact sales

Tell us about your team and we’ll put together pricing that fits. We usually reply within a day.